humeaProduct Development
Templates

From templates/prd-template.md · v1.4 · 2026-11-18

PRD template

The PRD, written as the Linear project document.

PRD · [Client] / [Area] / [Scope]

How to use this template: this is the Linear project document. Delete the quoted guidance as you fill each section. A draft with many "TBD" items is correct in Shaping: it shows what we do not know before we build. Target length: 2–4 pages. If it is longer, the scope is probably two PRDs.

Brief: for small work, fill only §1–§4 and §7 on one page and set Type to Brief.

TypePRD / Brief
Project status (in Linear)Shaping / Ready / Building / Measuring / Done
Owner
Reviewers
Client / Area / Iterationfor example Reloca / F4 HR / IT.6
Metric check-inYYYY-MM-DD (also a milestone)
Last updated

Milestones

One row per phase, then the metric check-in. A PRD with one phase has two rows. The rows match the milestones of the Linear project.

MilestoneTarget dateRequirements in scope
FoundationYYYY-MM-DDR-1, R-2
Metric check-inYYYY-MM-DD—

1. Executive summary

3–5 sentences, written last: the problem, who has it, what we build, the expected impact, the target date. A stakeholder who reads only this must be able to make the right decision.

2. Problem & evidence

One problem statement per paragraph, each followed by its evidence. Label the strength of each piece of evidence: measured (data), observed (research or tests), reported (anecdote or stakeholder claim). Observed evidence cites its research ID from humea-research-center: a study [RLC-2611], a nugget [RLC-2608-N001] or a pattern [PAT-001]. A PRD that has only "reported" evidence must say so.

Problem: … Evidence: … (measured / observed / reported — source or research ID)

3. Target customer & jobs to be done

The exact segment, not "users". Then the jobs in JTBD form. Say who this is not for, if people confuse the two.

  • Segment: …
  • JTBD: When [situation], I want to [motivation], so I can [expected outcome].

4. Goals & non-goals

Non-goals have the highest value in this document. They settle scope arguments now and not in the second sprint. Be concrete: name the adjacent things that we do not do in this version.

Goals

  1. …

Non-goals (this version)

  1. …

5. Proposed solution

What the experience is, the main flow from start to end, and why this approach is better than the alternatives (one line for each rejected alternative). Link the Figma explorations. Do not paste screens.

  • Approach: …
  • Main flow: …
  • Alternatives considered: … (and why not)
  • Design: [Figma link]

6. Requirements

One table for all requirements: functional, edge cases and non-functional. Each row is numbered, testable and has a priority (MoSCoW). "Must" means that the release cannot ship without it. Each story in Linear cites the R IDs that it implements. Do not write issue IDs here: the stories point to the requirements, not the reverse.

IDTypeRequirementPriorityAcceptance criterionMilestone
R-1FunctionalMustFoundation
R-2Edge caseEmpty state …Should
R-3Non-functionalWCAG 2.1 AA …Must

Checklist for edge cases and non-functional requirements. Each item that applies becomes a row. Remove an item only after you considered it:

  • Empty states: first run, zero results, no permission
  • Error states: validation, network failure, partial failure
  • Loading states: skeletons or spinners, slow connection
  • Permissions & roles: who sees and does what
  • Accessibility: WCAG 2.1 AA — contrast, keyboard, focus, screen reader labels
  • Localization: the locales in the client profile; text expansion; date and number formats
  • Performance: targets (for example p95 load < X s)
  • Data & privacy: personal data touched, retention, GDPR
  • Devices: responsive breakpoints, mobile first

7. Acceptance criteria (release level)

What must be true before this PRD ships. Release level only. Story criteria are on the Linear issues. Write criteria that a person can check.

  • …
  • All Must requirements are implemented and verified
  • Accessibility check is done (contrast, keyboard, labels)
  • The analytics events from §8 fire and are validated

8. Success metrics

How we will know that it worked, and when we will look. Each metric needs a baseline, a target, a check date and a source. Include at least one guardrail: a thing that must not get worse. The check date is the date of the Metric check-in milestone. /ship-review fills the Actual column.

MetricBaselineTargetCheck onSourceActual
Guardrail:must not drop

Instrumentation needed: events to add or verify before launch.

9. Risks & mitigations

RiskLikelihoodImpactMitigationOwner
L/M/HL/M/H

10. Dependencies

External and internal: other teams, client approvals, third-party APIs, content or legal, other PRDs. Who waits for whom, and until when.

11. Open questions & decisions log

Mark each open question: does it block the build or not. Each decision has a date and a person. Log here: scope changes, deferred or dropped requirements, results of the client review, and the reason for Paused or Canceled.

Open

  • … (blocking? Y/N — owner)

Decided

  • YYYY-MM-DD — decision — by who

On this page