humeaProduct Development
References

From references/status-model.md · v1.4 · 2026-11-18

Status model

Project and issue statuses, entry rules, labels and names.

This file is the single source for statuses, entry rules and labels. The guide and the skills link here. A status has an entry rule. Move an item to a status only when the rule is true.

Project statuses

One project = one PRD.

StatusLinear typeEntry rule
ShapingBacklogThe PRD or brief is in draft or in review
ReadyPlannedThe PRD is approved. Stories meet the Definition of Ready
BuildingStartedThe first story started
MeasuringStartedShipped. The Metric check-in milestone has a date
DoneCompleted/ship-review wrote the verdict in the PRD
PausedPausedThe decision is logged in PRD §11
CanceledCanceledThe decision is logged in PRD §11

Issue statuses

One issue = one user story.

StatusLinear typeEntry rule
TriageTriageInbound: a client request, a bug, or work found with no issue. Nobody accepted it yet
BacklogBacklogAccepted, not scheduled. Add the label Needs clarification if the story is not clear
TodoUnstartedMeets the Definition of Ready. A person or an agent can start it
In ProgressStartedWork started
In ReviewStartedA PR is open, or design is in review. The GitHub integration moves it
VerifyStartedSomeone other than the builder checks the acceptance criteria. /qa works here
DoneCompletedThe acceptance criteria pass
CanceledCanceledClosed without delivery. Linear duplicates go here

There is no "Blocked" status. Use the Linear "blocked by" relation. The saved view "Blocked" filters on the relation.

Definition of Ready (entry rule for Todo)

A story enters Todo only when it has all of these:

  1. The requirement IDs it implements (R-n) and a link to the PRD.
  2. Acceptance criteria that a person can test, with at least one failure path.
  3. A link to the design frames, with the states covered.
  4. The events it must emit, if the PRD has metrics for it.
  5. The repo or surface where the work happens.
  6. A way to verify it: the environment and the steps or the test.
  7. A named verifier, who is not the builder.

Definition of Done (entry rule for Done)

A story moves from Verify to Done only when someone other than the builder verified each acceptance criterion. An agent cannot verify work that it built.

Labels

GroupApplies toValues
DisciplineIssueDesign, Engineering, Product, Content
ClarityIssueNeeds clarification
Document typeProjectPRD, Brief, No-PRD (ops or maintenance projects)
AreaProjectFrom the client profile. For example F0 Marketing … F5 Partners, Platform
TrackProjectTrack, only for parallel tracks of one PRD
IterationProjectUse Linear cycles if the team uses them. If not, IT.n

Names

ThingPatternExample
Project[Client] / [Area] / [Scope]. Add / V02 only for a second versionReloca / F4 HR / Recruiter pipeline
PRD documentPRD · [project name]PRD · Reloca / F4 HR / Recruiter pipeline
MilestonePhase name. Defaults: Foundation, Enhancement, PolishFoundation
Last milestoneMetric check-in, with the date from PRD §8
RequirementR-nR-3

Old → new mapping (migration only)

Old project statusNew
BacklogShaping (PRD not approved) or Ready (PRD approved)
PlannedReady
In Progress, Ready to QA, In QABuilding
CompletedMeasuring (no ship-review yet) or Done (ship-review done)
Archived (custom status)Done, then use Linear archive
CanceledCanceled
Old issue statusNew
To be clarifiedBacklog + label Needs clarification
Backlog, Todo, In Progress, In Review, Done, CanceledSame name
Ready 4 QA, In QAVerify
BlockedThe status before the block, plus a "blocked by" relation
DuplicateCanceled (Linear duplicate flow)

On this page