humeaProduct Development
Guide

From guide/humea-product-development-guide.md#5 · v1.4 · 2026-11-18

5. Reference

Statuses, names, phases, files, glossary, questions and rollout.

Statuses

Each status has an entry rule. The full tables, the Definition of Ready, the labels and the naming patterns are in references/status-model.md.

  • Project (one PRD): Shaping → Ready → Building → Measuring → Done. Also Paused and Canceled.
  • Issue (one story): Triage → Backlog → Todo → In Progress → In Review → Verify → Done. Also Canceled.
  • Blocked is not a status. It is a "blocked by" relation between issues.

Names

  • Project: [Client] / [Area] / [Scope]. Add / V02 only for a second version.
  • PRD document: PRD · [project name].
  • Milestones: phase names. The defaults are Foundation / Enhancement / Polish. Use a descriptive name when the phases are not a sequence (for example "Mobile", "Localization"). The last one is Metric check-in.
  • Requirements: R-1, R-2… in PRD §6.

Phases and milestones

  • When to use phases: sequential delivery (MVP, then enhancement), risk reduction (prototype, then full build), or limited capacity. Do not use phases for A/B alternatives or parallel experiments. Those are separate PRDs.
  • How: each phase is a milestone in the same project. The PRD lists the milestones and the requirements in scope for each. /to-issues [milestone] breaks down one milestone at a time.
  • Adding a phase later: add a milestone to the project and a row to the Milestones table in the PRD. Then run /to-issues [new milestone].
  • Shipping with scope left: before the project goes to Done, each Must or Should requirement that was not built is deferred to a next version or dropped. Log this in §11.

Files in this repo

Templates

  • templates/prd-template.md — the PRD (Linear project document)
  • templates/linear-project-template.md — the project description
  • templates/user-story-template.md — the Linear issue for a user story
  • templates/client-profile.md — the client profile (Linear document on the initiative)

References

  • references/status-model.md — statuses, entry rules, labels, names
  • references/sources.md — where each thing lives, how to cite research
  • references/skill-rules.md — rules that all skills share

Skills

  • /prd — interview → draft → Linear project and PRD document. It also makes briefs (rule 1)
  • /to-issues — PRD → story map → Linear issues, one milestone at a time
  • /project-description — fill or refresh a project description from its PRD
  • /eod-sync — keep Linear current from the day's work; drafts the weekly project update
  • /qa — check a story in Verify against its acceptance criteria
  • /ship-review — metric actuals → verdict → Done; applies rule 5
  • /ssot-audit — Linear hygiene report; applies rules 2 to 5 and 8

Glossary

TermMeaning
Acceptance criterion (AC)A statement that a person can check as true or false. Stories have them in Given/When/Then form. The PRD has release-level criteria in §7
BriefA one-page PRD for small work: §1–§4 + §7
BuilderThe person who does the work on a story, alone or with an agent
Client profileThe Linear document with the facts about one client. Skills read it
DelegateAn agent that works on an issue for the assignee
Entry ruleThe condition that must be true before an item moves to a status
GuardrailA metric that must not get worse
Metric check-inThe date when we read the results. It is the last milestone of each project
PRDProduct requirements document. The source of truth for scope
ProposalThe draft that a skill shows before it writes anything
Requirement (R-n)One numbered row in PRD §6
VerdictThree lines at the top of a shipped PRD: result, why, follow-up
VerifierThe person, named on the story, who checks it in Verify. Never the builder

Questions

Brief or PRD? If the work is less than about one sprint for one team and does not touch pricing, data or another team: a brief. If you are not sure, start /prd. It asks and recommends.

Do I need a new project for the next phase? No. Add a milestone. A new project is only for new scope ( / V02) or a parallel track with a different lead.

My story is blocked. Which status? Leave the status as it is. Add a "blocked by" relation to the issue that blocks it. It then shows in the Blocked view.

A story in Todo is not clear. What do I do? Do not start. Comment with the question and add Needs clarification. The story goes back to Backlog until it meets the Definition of Ready.

Can I move my own story to Done? No. The verifier does that, after the check in Verify.

Can an agent build a story? Yes, as a delegate of the assignee, from Todo. It writes a plan on the issue first, and the assignee accepts it. A different person or agent verifies it, and a person moves it to Done.

Where do I put research? In humea-research-center. In the PRD, cite the ID, for example [RLC-2611].

Where do I put a decision? A decision about one scope: PRD §11. A decision that is larger than one PRD: the Decision log of the client. Then post a one-line comment in the project's Activity tab that links the §11 row, so that the team sees it. /eod-sync drafts this comment. The record stays in §11.

How does the client review a PRD? The PRD owner presents it and logs the result in §11. The client profile names the review path.

The check-in date came, but there is too little data. Run /ship-review. It proposes a new check-in date and logs the change in §11. The project stays in Measuring.

How do I change this guide? Open a PR in this repo. One maintainer reviews. The steps are in README.md.

Rollout

  1. Linear workspace. Set the statuses, labels, templates and views. Add the Client profile and Decision log documents to each client initiative.
  2. Reloca first. Move each Reloca PRD into its Linear project document. Run /ship-review on the shipped PRDs. Fix the projects that drifted.
  3. Measure after two cycles against the pilot baselines: PRDs with drift (7 of 15), shipped PRDs closed with a verdict (0 of 5), issues that wait in Verify (69). The number of PRDs and briefs started must not drop.
  4. Then the next client.

The checklists are in docs/v1.3-change-plan.md, Parts D, E and F.

On this page